Chelsea Park Estates Phase 4

Chelsea Park Estates offers fully serviced and building permit-ready lots in a full service setting in the Town of Lakeshore. This development is situated less than 20 minutes from the City of Windsor off County Road 22, along I.C. Roy Drive. Immediately north of a new bilingual elementary school and the new St. Anne’s Secondary School, Chelsea Park is an ideal location for families with school aged children. Both new schools are within walking distance and the subdivision has sidewalks throughout. Chelsea Park is an exclusively single family neighborhood with 65 foot minimum lot frontages. It is within minutes of all amenities.

Wallace Woods

Amico is in the process of obtaining regulatory approvals for approximately 200 acres contained within the Wallace Woods Master Plan Community. The majority of this parcel piece has been designed to accommodate a variety of housing types including some that will enjoy locations in close proximity to woodlots, natural areas and walking trails.

The Wallace Woods Master Plan Community has been designed to protect the approximate 200 acres of wooded area that exists. In addition the design calls for naturalization of areas so that the woodlots will be connected to one another by a naturalized storm water management system and some areas of new planting. Residential densities within the areas are planned to be variable with a wide variety of housing types being offered. A central commercial area and higher end industrial development on the west side of the 1,500 acre area are also included.

The secondary plan for this development is currently being drafted to be released later this year. The proposed plan for this area is illustrated above.